This recent pool installation was carried out with resticted access down the side of a garage.

 

The fall of the ground was approximately 2.5 Metre from one end of the excavation to the other. To compensate for this retraining walls were constructed on 3 sides of the pool to retain the exisiting ground levels. The walls were designed by a structural engineer and passed by building control prior to construction.

The fully tiled pool was complete with an Automatic slatted cover, Gas heating and state of the Art filtration incorporating fully automated control.

A Spa pool was installed alongside the pool to enhance the whole project.

The pool surrounds, expansive step layouts and terracing around house were finished with Indian York Stone with a tumbled "Antique"finish to give a very warm feel to the pool area.